Calif. Solar Project Gets $1.4 Bil. Federal Loan Guarantee
By wchung | 08 Jun, 2026
The Obama administration has given preliminary approval for $1.4 billion in loan guarantees for a massive solar-energy project in California’s Mojave Desert.
U.S. Energy Secretary Steven Chu said Monday that BrightSource Energy was in line for the financing help to build solar-energy plants to power 140,000 homes.
The federal agency will consider the project’s likelihood of being completed and the Oakland-based company’s ability to repay loans before making a final decision.
Environmentalists want the complex relocated because they say it will harm protected desert tortoises. BrightSource has made design changes in an attempt to alleviate environmental concerns.
2/22/2010 7:55 PM LOS ANGELES (AP)
Recent Articles
- Bedtime Story: The Scholar Who Entered a Painting
- First Filipino NBA Champion, LPGA Korean Duo, BYU’s Akina Honored
- China May Exports Pegged for Strong Growth on Front-Loaded Orders, Chip Demand
- China's Global E-Commerce Slides as Iran War Lifts Costs, Dampens Demand
- S. Korea to Seek Priority Supply of Nvidia Vera Rubin GPUs
- VinFast Q1 Revenue Surge on Strong Southeast Asia EV Demand
- KOSPI Plunges on Fed Rate Hike Bet
- Nvidia Clinches Pacts with S. Korean Tech Giants Deep into the AI Boom
- Gwynne Shotwell Manifested Musk's Lofty SpaceX IPO
- Lip-Bu Tan's Intel Eyed to Make Three Million Custom AI Chips for Google
